Push Piers: How Steel Resistance Piers Work and When They Don't

A push pier is proof-loaded against the weight of your own house as it goes in. That makes it the only common pier that is tested one by one during installation, and it's also why it struggles under light structures.

Sources cited

Updated

Mini excavator digging a trench beside a house
Illustrative photo, not a listed contractor’s work. Credits

Push piers are steel pipe sections driven hydraulically through a bracket under your footing, using the weight of the house as the reaction force, until each pier reaches a proof load set by an engineer and stops moving. That built-in load test is their main advantage. They need a heavy enough structure and a sound footing, and several systems hold current ICC-ES evaluation reports.

If you are choosing between repair types, the foundation repair methods guide compares every pier and slab method side by side. This page goes deeper on push piers only: how the load test works, what the evaluation reports say, and what to check on a proposal.

What is a push pier?

A push pier is a steel pipe pile pushed into the ground by a hydraulic ram that braces against the existing foundation. You’ll also see it called a steel push pier, resistance pier, hydraulically driven steel pipe pile or, in Ram Jack’s term, a steel pressed piling (Ram Jack). One ICC-ES report defines the system as “a hydraulically driven steel pipe piling system” designed “to resist axial compressive loads from the supported structures” (ESR-4317, §2.0).

A typical system has four parts: a steel bracket anchored to the side or underside of the footing, an external sleeve that stiffens the top of the pile, a starter section (often with a friction-reduction collar at the tip) and extension sections added as the pile goes deeper. In ESR-5005 the starter pipe is 2.875 inches in diameter and about 4 feet long, inside a 48-inch external sleeve (ESR-5005, §3.2). Grip-Tite’s tubes are 3 inches in diameter in 3-foot sections (ESR-4891, §3.2.1).

Push piers at a glance
QuestionShort answerWhere it comes from
What pushes the pier down?A hydraulic ram reacting against the weight of the houseESR-5005 §4.2
How is capacity proven?Each pier is driven until it holds the engineer's proof load and stops movingESR-4317 §4.2.1
How deep?No fixed depth: to soil or rock that holds the proof loadEarth Contact Products; inspector records final depth
How far apart?Set by the engineer; ESR-4891 caps spacing at 6 ft unless an engineer sets anotherESR-4891 §5.14
What loads?Compression only, under laterally braced structuresESR-4317 §5.3; ESR-5005 §5.7
Best fitHeavier structures on sound, uncracked footingsNevison, P.E.; ESR-4891 §5.3
Poor fitLight structures, cracked footings, tension or lateral loads, corrosive soilSee the decision matrix below
Typical priceAbout $990 to $3,000 per pier, depending on the sourceAngi, Olshan, Ram Jack (2026)

How do push piers carry your house?

Push piers carry the house by transferring its weight from the weak soil near the surface, through the bracket and steel shaft, to deeper soil or rock that can hold it. The same weight is what drives them in: “The existing structure is used as a reaction force with a hydraulic pump and cylinder combination to drive the pier into the soil” (ESR-5005, §4.2).

That has a direct consequence. The ram can only push as hard as the house can hold it down. If the soil resists more than the structure weighs, the house rises instead of the pier going deeper. That is the root of most push-pier limits, covered in the decision matrix below.

Eccentric (side-load) vs concentric brackets

Many push piers, including all three systems in the reports below, use a side-load bracket that sits beside the footing, so the pier is slightly offset from the wall it carries. The reports treat that offset as a design issue. ESR-4891 says the bracket arrangement “introduces structural and bracket eccentricity” (ESR-4891, §3.2.3), and ESR-4891 and ESR-5005 both require the concrete foundation to be designed “with due consideration to the eccentricity of the applied loads” (ESR-4891, §4.1.2; ESR-5005, §4.1.2). ESR-4317 sets the same requirement (§4.1.2).

A concentric system places the pier directly under the load. One manufacturer describes its concentric pier as aligning “the lifting force directly with the pier,” while eccentric systems “position the pier adjacent to the foundation” (Earth Contact Products). Which one fits is an engineering choice, but it’s fair to ask your contractor which type they’re proposing and how the footing was checked for the offset.

How are push piers installed?

Push piers are installed one at a time from small excavations beside the footing, following an engineer’s pier plan. The evaluation reports describe the same core sequence:

  1. Survey and plan. Utilities are located, and piers go in “according to a pre-approved plan of placement” (ESR-4317, §4.2.1; ESR-5005, §4.2).
  2. Excavate at each pier. Grip-Tite calls for removing soil “a minimum of eight (8) inches beneath the footing,” with about 3 square feet of space per location (ESR-4891, §4.2.4–4.2.5). IMG specifies about 2.5 square feet to 8.5 inches below the bottom of the footing (ESR-5005, §4.2).
  3. Prepare the footing. The bearing area is cleaned, smoothed and leveled, and the face of the stem wall trued to vertical. Notching the footing may be needed, under an engineer’s guidance (ESR-5005, §4.2).
  4. Mount the bracket and start monitoring. The bracket is anchored to the footing, “the elevation of the structure at each pier location is measured and a building monitoring program is established” (ESR-4317, §4.2.1).
  5. Drive the pier. A calibrated hydraulic ram pushes sections down, adding extensions as it goes (ESR-4891, §4.2.7). Piers must be plumb within 1 degree (ESR-4317, §5.7), and “Adjacent piers must not be advanced simultaneously” (ESR-5005, §4.2).
  6. Proof-load and lock off. Driving continues until the pier holds the proof load and stops moving. Then “the pressure should then be reduced to the desired push pier lock-off pressure,” the pier is secured to the bracket and the ram removed (ESR-4317, §4.2.1).
  7. Lift, if planned, then backfill. Soil is replaced and compacted “after the piers are proof load tested” (ESR-4891, §4.2.8).

Each report also requires installers trained or certified by the manufacturer, and the code-required special inspection described below.

How is each push pier proven? Proof load and the install log

Each push pier is proven by the act of installing it: the ram drives it until the force on it reaches a proof load and the pier stops moving, so every pier has been tested to at least that load before it carries the house. ESR-4317 says piers are pushed “until the load used for driving the pier equals or exceeds the required proof test capacity and pile movement halts,” and “The proof load must be determined by a registered design professional” (ESR-4317, §4.2.1). A practicing engineer puts it simply: “Each push pier is load tested during installation, so the actual capacity is verified on every pier” (Nevison, P.E., WATERPROOF!, Dec 2024).

How much higher the proof load is than the load the pier will carry is the engineer’s decision. ESR-4317 leaves “the required safety factor” to “a registered design professional” (§4.1.1). One Supportworks dealer states that “1.5 to 2 times the amount of force is placed on the pier” during installation compared with the load it will hold (Woods Basement Systems, 2014). Treat that as one contractor’s description, not a rule.

Building officials rely on this record. Portland’s building official requires continuous special inspection of push pier installation. Where a job qualifies for its exception that waives that inspection and the site-specific soils report, the engineer’s stamped final report must still give the load tests: “the load test values shall be reported verifying the geotechnical design capacity” (City of Portland BOD 25-01, Feb 2025). The ICC-ES reports list what the special inspector records, including “tip elevations, the installation pressure and final depth” and the inclination and location of each pier (ESR-4317, §4.3).

Reading a sample install log

An install log should list every pier with its depth, final drive pressure, the load that pressure represents, lock-off and any lift. The ram gauge reads pressure in psi. The load on the pier is the pressure multiplied by the ram’s piston area, so ask for the conversion chart for the calibrated ram used on your job.

Hypothetical push pier install log (invented numbers for illustration)
PierFinal depthFinal drive pressureLoad at final driveLock-off pressure → loadLiftReading
P122 ft3,800 psi18.7 kips2,500 psi → 12.3 kips0.50 inReached proof load, stopped moving
P224 ft3,750 psi18.4 kips2,450 psi → 12.0 kips0.75 inReached proof load, stopped moving
P319 ft3,700 psi18.2 kips2,450 psi → 12.0 kips1.00 inReached proof load, stopped moving
P49 ft2,900 psi14.2 kipsNot locked off—House lifted before proof load: engineer to review

How the hypothetical numbers work

Assume an engineer sets a working load of 12 kips per pier and a proof load of 18 kips (1.5 times, the low end of the dealer claim above), and the ram’s piston area is 4.91 square inches (a 2.5-inch bore). Load = pressure × area: 3,800 psi × 4.91 in² = 18,658 lb, or 18.7 kips. The proof-load target is 18,000 lb ÷ 4.91 in² ≈ 3,666 psi. P4 is the warning case: the footing rose at 2,900 psi (14.2 kips), so that pier never reached the proof load. These are not typical values. Your engineer’s numbers and your ram’s calibration decide.

Three things to look for in a real log: every pier reached the proof load stated on the plan, depths that vary from pier to pier (identical depths are worth a question), and a clear note on any pier that stopped short.

Bracket, shaft and soil: three different capacities

A push pier is only as strong as the weakest of three things: the bracket, the steel shaft and the soil at its tip, plus the footing it’s bolted to. The ICC-ES reports rate the steel separately and leave the soil to the engineer. Grip-Tite’s report states that “Registered design professionals must determine the soil compression capacity” and use it “if it controls the design” (ESR-4891, Table 1 note 7).

That’s why a big advertised number isn’t what your house gets. One manufacturer lists a bracket with “an ultimate capacity of 99,000 pounds” (Earth Contact Products). An ultimate capacity is a failure-level figure. The evaluation reports publish allowable capacities, which are the design limits an engineer works to, and those are far lower (see the table below). The capacity used on your house is the lowest of the bracket, shaft, soil and footing checks.

Push pier evaluation reports: ESR-4317, ESR-4891 and ESR-5005

An ICC-ES evaluation report (ESR) is an independent finding that a product complies with the building code under stated conditions. We checked three current push pier reports in October 2026. Two are evaluated under ICC-ES AC517, the acceptance criteria for push pier foundation systems, “dated February 2020 (editorially revised May 2024)” (ESR-4317, §6.0; ESR-4891, §6.0). The third, ESR-5005, lists bracket eccentric compression load tests to ASTM E72 and quality documentation under AC10 as its evidence (ESR-5005, §6.0).

Current ICC-ES push pier evaluation reports (checked October 2026)
ReportProductReissuedAllowable bracket capacityAllowable shaft capacityConditions worth knowing
ESR-4317Magnum MP325G push pier (3-in shaft) with three side-load bracketsSept 202635.0 to 39.3 kips, by bracket (MP1005-3, MP1002-3, MP1001-3)60 kips, fully braced only; longer unbraced lengths set by an engineerIBC only; Seismic Design Categories A–C; concrete must be uncracked at service loads; capacities include a 50-year corrosion allowance; continuous special inspection
ESR-4891Grip-Tite FP3T shaft (3-in) with FP3BA side-load bracketAug 202621.7 kips30.8 kips uncorroded; 24 kips for bare steel after 50-year corrosion lossIRC use needs an engineered design; seismic loading not addressed; uncracked normal-weight concrete; spacing 6 ft max unless an engineer sets another
ESR-5005IMG PP21617-34 push pier (2.875-in starter)Oct 202628.1 kips, with up to 5 ft unsupported below the bracketNot evaluated (outside the report's scope)Compression only; uplift and lateral loads must be carried by the existing foundation; corrosion and durability outside scope; seismic loading not addressed

Conditions shared by all three reports:

  • An engineer’s design. Calculations and drawings by a registered design professional, approved by the code official (ESR-4317, §5.8; ESR-5005, §4.1.1).
  • Special inspection under IBC Section 1705.7. ESR-4317 says it “must be performed continuously during installation” (§4.3).
  • Laterally braced structures only. “All brackets must be used only to support structures that are laterally braced as defined in IBC Section 1810.2.2” (ESR-4317, §5.3).
  • Sound concrete. ESR-4891 and ESR-5005 limit use to “uncracked normal-weight concrete” (ESR-4891, §5.3; ESR-5005, §5.4), and ESR-4317 to concrete where analysis shows no cracking at service loads (§5.4).
  • Settlement is the engineer’s call. Each report puts the pier’s own settlement outside its scope, to be determined by a registered design professional under IBC Section 1810.2.3 (ESR-4317, §5.15).
  • Existing buildings only, in Los Angeles. Each report’s City of LA supplement says the system “must not be used to support new structures” and must not resist horizontal loads (ESR-4317, LA Supplement).

Check the report number, not just the brand

An ESR number on a proposal may belong to the maker’s helical line rather than its push pier. Ram Jack’s ESR-1854, for example, is evaluated under AC358, the criteria for helical foundation systems (ICC-ES ESR-1854). To check, search the number in the ICC-ES report directory at icc-es.org, open the PDF, confirm the product name and model numbers match what’s on your proposal, and check the reissue date at the top. A product without a report isn’t automatically unsafe, but your engineer and code official then have to accept it some other way.

When are push piers the wrong choice?

Push piers are the wrong choice when the structure is too light to drive against, when the footing can’t take the bracket load, or when the job needs a pier to resist pulling or sideways forces. Because they “rely directly on the innate weight of the structure,” a light home can begin “to lift before the desired depth is reached” (Dalinghaus, 2024). Nobody publishes a verified weight threshold, so the most useful guidance is an engineer’s rule of thumb: “if you have to ask if it is too light to use push piers, use helical piers” (Nevison, P.E., WATERPROOF!).

Push pier decision matrix: conditions that change the answer
ConditionWhy push piers struggleWhat an engineer may consider insteadSource
Light structure: porch, garage, small addition, some single-story slabsNot enough weight to reach the proof load before the structure liftsHelical piers, which get capacity from torque, not building weightNevison, P.E.; Dalinghaus
Shallow footing or thickened-edge slabLess weight and less concrete to bracket againstHelical piers; push piers are typically fine at basements and frost-depth footingsNevison, P.E.
Cracked or broken footingReports limit use to uncracked concrete; the bracket needs sound concrete to bear onRepair the footing first, or a different support designESR-4891 §5.3; ESR-4317 §5.4; Dalinghaus
Uplift, tension or sideways load (wind, seismic, retaining wall)Rated for compression only; push piers can't resist tension without field welding or special workHelical piers or anchors designed for tension or lateral loadESR-5005 §5.7; Nevison, P.E.
Pier would need to go in at an angleMust be installed plumb, within 1 degreeHelical or other battered pilesESR-4317 §5.7; Dalinghaus
Corrosive soil: resistivity below 1,000 ohm-cm, pH below 5.5, sulfates above 1,000 ppm, high organics, landfill or mine wasteOutside the scope of the evaluation reportsEngineer-specified corrosion protection or a different systemESR-4317 §5.5; ESR-4891 §5.5
Higher seismic design category (D, E or F) or Site Class E or FOutside ESR-4317's scope; needs separate code-official approvalEngineer's site-specific designESR-4317 §5.2
New constructionLA supplements limit the reports to existing structuresA foundation system designed as new constructionESR-4317, ESR-5005 LA supplements
Only part of the house is movingPiers support only where they're placedUnderpin the moving area and fix drainage; unpiered areas keep their old behaviorTexas Section ASCE §7.4.3.1

The last row matters more than people expect. Texas Section ASCE guidance says construction documents “should state that underpinning will not improve the performance of the foundation in non-underpinned areas” (Texas Section ASCE, Version 3, §7.4.3.1). If the cause is a plumbing leak or poor drainage, piers alone won’t stop it. For a side-by-side of the two steel pier types, see helical piers vs push piers, and for the other option on its own, how helical piers work.

How deep and how far apart are push piers installed?

Push piers have no standard depth and no single standard spacing: depth is wherever each pier reaches the proof load, and spacing is set by the engineer’s load calculations. Earth Contact Products states, “There is no single installation depth for a steel push pier” (ECP). The final depth of each pier is one of the items the special inspector records (ESR-4317, §4.3), so it belongs on your install log, not in the sales pitch.

For spacing, only one current report gives a number: “The Grip-Tite® Push Pier System spacing shall be limited to 6 ft (1830 mm) unless an alternative spacing is determined by a registered design professional” (ESR-4891, §5.14). ESR-4317 instead asks the geotechnical report for a “recommended center-to-center spacing” and any reduction for group action (§4.1.1). On a professional engineering forum, practitioners describe spacing as “typically 5-6 ft. by rule of thumb,” with product engineers “usually” choosing “4’ to 6’ spacing along foundation walls” (Eng-Tips, anonymous). One poster adds that when the foundation can span farther, wider spacing is what they design. That’s practitioner anecdote, not a standard.

Spacing matters because each pier carries the wall load for its share of the length. In a hypothetical wall carrying 2,000 pounds per linear foot, piers at 6 feet each carry 2,000 × 6 = 12,000 pounds (12 kips), and piers at 4 feet carry 8 kips. Wider spacing means fewer piers but more load per pier, and the footing has to span farther between supports, which is why ESR-4317 requires the design to consider the “maximum span(s) between push pier systems” (§4.1.1).

Can push piers lift a house back to level?

Push piers can often lift settled areas back toward their original elevation, but a perfectly level house is not a realistic promise. Texas Section ASCE guidance says lifting “should be governed by field judgment to limit damage to the foundation and finishes. It is unlikely that elevation adjustments will result in a level foundation” (Texas Section ASCE, Version 3, §7.4.3.1). One manufacturer lists a “standard lift” of 4 inches for its concentric pier (ECP). That’s a product specification, not what your house will tolerate.

Stabilizing and lifting are separate decisions. Some jobs lock the piers off at the current elevation to stop further settlement. Others also raise it. If yours includes a lift, the same Texas guidelines recommend two follow-ups:

  • Plumbing test. “Water supply and sanitary drain lines should be tested for leaks if jacking or lifting is included in the remedial measures” (§7.6).
  • Elevation survey after the work. Repair documents should include “the requirement for performing a floor elevation survey after completion of the remedial measures” (§7.4.1, item 11).

These are Texas guidelines written with expansive clay in mind, but the reasoning applies anywhere a house is lifted. For what a lift can crack and how to read a floor-level survey, see the house leveling guide.

What does a push pier warranty cover?

The “25-year warranty” in most push pier marketing is usually the manufacturer’s warranty on the steel, not a promise about how your house will perform. One Supportworks dealer states its push pier systems “include a 25-year warranty against manufacturing defects” plus “our own performance warranty,” without giving the performance terms (Atlanta Basement Systems). Another manufacturer offers “a 25-year warranty on every steel pier we make” (ECP).

The steel’s design life is a different measure again. ESR-4317’s allowable capacities “include an allowance for corrosion over a 50-year service life,” and ESR-4891 reduces its shaft rating to 24 kips for bare steel after 50 years of corrosion loss, while ESR-5005 leaves corrosion outside its scope (ESR-4317, Table 1; ESR-4891, Table 1; ESR-5005, §5.6).

Get the contractor’s performance warranty in writing and ask:

  • Does it transfer to a buyer, and is there a fee or a deadline to transfer it?
  • Does it cover re-adjusting (re-lifting) piered areas if they settle again, and who pays for access and restoration?
  • Does it cover only the piered sections? Under the Texas guidance above, unpiered areas keep their old behavior.
  • What voids it, such as drainage changes, plumbing leaks or additions?
  • Is it backed by the company alone, or by the manufacturer or a third party if the company closes?

How much do push piers cost?

Published 2026 figures put a steel push pier at roughly $990 to $3,000 per pier, and the number of piers drives the total far more than the unit price. The three sources below measure different things: a national average, one regional contractor’s slab price and one manufacturer network’s range.

Published push pier prices

Engineering, permits, special inspection, interior access and restoration usually sit on top of the per-pier price. For full project ranges, see the foundation repair cost guide and push pier cost. To turn a pier count into a planning range, use the foundation repair cost calculator. If a helical design is on the table too, compare against helical pier cost. Only written quotes from contractors near you give you an actual price.

Questions to ask before you sign a push pier proposal

A good push pier proposal answers these questions in writing before work starts:

  1. Which evaluation report covers this exact product? Get the ESR number and confirm the model numbers match.
  2. Who designed the pier plan, and what proof load and working load does it set per pier? The reports leave both to a registered design professional.
  3. What spacing, and why? If it’s wider than 6 feet, ask how the footing span was checked.
  4. Is the footing sound enough to bracket? Ask how cracked or shallow sections will be handled.
  5. Eccentric or concentric brackets? And how the footing was checked for the offset.
  6. Is a permit and special inspection included? Portland, for one, requires continuous special inspection, or reported load test values where that inspection is waived.
  7. Will I get the install log? Depth, final drive pressure, converted load and lock-off for every pier, plus any pier that stopped short.
  8. Is a lift included, and how much? If so, ask for a plumbing test and a before-and-after floor elevation survey.
  9. What does the performance warranty cover, and does it transfer?

If the answers point to a cause such as drainage or a leak rather than deep settlement, or you just want a second read, an independent structural engineer’s evaluation can tell you whether piers are the right fix before you pay for them. Not sure your house is moving at all? Start with the signs of foundation problems.

Comparing push pier proposals? Get a second bid from vetted piering contractors near you.

Push pier questions

How do push piers work?

A steel bracket is bolted to the footing, and a hydraulic ram uses the weight of the house to drive steel pipe sections into the ground one after another. Driving continues until the load on the pier reaches the proof load set by the engineer and the pier stops moving. The pressure is then reduced to a lock-off value, and the house rests on the pier instead of the weak soil near the surface.

How deep do push piers go?

There is no fixed depth. Each pier is driven until it reaches soil or rock that holds the required proof load, so depth varies from pier to pier on the same house. One manufacturer states plainly that there is no single installation depth for a steel push pier. Ask for an install log that records the final depth and drive pressure of every pier, which is what a special inspector records.

How far apart are push piers placed?

The engineer sets spacing from the load along the wall and the capacity of each pier. One current ICC-ES report, ESR-4891, limits spacing to 6 feet unless a registered design professional sets another spacing. Practitioners commonly describe 4 to 6 feet along a foundation wall. Wider spacing puts more load on each pier and asks the footing to span farther between supports.

When are push piers not a good option?

Push piers need enough building weight to drive against, so light structures such as porches, small additions and some single-story slabs can lift before the pier reaches good soil. They are also a poor fit for cracked or broken footings, for loads that need tension or sideways resistance, and in corrosive soils. One engineer's rule of thumb is that if you have to ask whether a structure is too light, use helical piers.

Can push piers lift my house back to level?

They can often raise settled areas, but perfectly level is not a realistic promise. The Texas Section ASCE repair guidelines say it is unlikely that elevation adjustments will result in a level foundation and that field judgment should limit lifting to avoid damage. They also recommend leak-testing water and drain lines after any lift and a floor elevation survey when the work is finished.

How long do push piers last, and what does the warranty cover?

Galvanized steel push piers are meant as permanent supports, and two current evaluation reports account for 50 years of corrosion in their steel ratings. The familiar 25-year warranty is usually the manufacturer's warranty against defects in the steel. The installing contractor's performance warranty is separate, so get it in writing and ask whether it transfers to a buyer and whether it covers re-adjustment.

Are push piers approved by building code?

Several push pier systems hold current ICC-ES evaluation reports, including Magnum ESR-4317, Grip-Tite ESR-4891 and IMG ESR-5005. These reports show code compliance only under listed conditions, such as an engineer's design approved by the code official, special inspection, laterally braced structures, uncracked concrete and compression loads only. Ask your contractor which report covers the exact product they will install.

Are push piers better than helical piers?

Neither is better everywhere. Push piers prove each pier by loading it against the house during installation, which suits heavier structures on sound footings. Helical piers are screwed in, get their capacity from installation torque, can resist tension, and suit lighter structures. Soil, building weight, footing condition and access decide, and an engineer should make the call.